Our Archievements
TPIPP, 2024
Mukdahan municipality waste to energy power plant project, designed for production capacity of 9.9 MW with 2*350 t/d grate boilers, is now preparing for civil construction.
TPIPP, 2024
Grate boiler of MSW with a capacity of 750t/d waste incineration, including the auxiliary equipment, purchase, installation, debugging, operation, and maintenance of relative material and the relevant civil construction. The project started in the mid of 2023 and it be handed over in October 2024.
TPIPP, 2022
TPI, 2018
The company started construction work of 3*750T/D Grate Boiler Project of WTE Power Plant, and the project was put into production in July ,2020.
TPI, November 2016
The company started construction work of 2*750 T/D Grate Boiler for Waste to Energy Power Plant of TPI, and the project was completed in May, 2018.
TPI, 2016
The company started construction work of TPI company 35t/h CFB boiler/6MW Coal Fired Power Plant in year 2016, and the project was handed over to TPI and has been operated by TPI since September,2017.
TPI, February 2015
The company contracted EPC project 2*75 t/h Boiler of RDF Power Plant of Thai TPI Polene Power Public Co,Ltd.This project was completed in September ,2016, started operation in May,2017 and handed over to the Owner and was operated by the owner in December, 2015.
SCG, August 2014
TPI, March 2013
The company contracted an EPC project of 35 t/h CFB boiler/6 MW coal fired power plant of TPI Thailand. This project mainly composes of one unit of 35 t/h CFB boiler and one unit of 6MW extraction condensing steam turbine generator unit. This project was handed over to TPI in May,2014 and has been in normal operation till now.